|
City Engineering Department
I. FUNCTIONAL STATEMENT
Administers, coordinates, supervises and controls the construction, maintenance, improvement and repair of roads, bridges and other engineering and public works projects of the LGU;
Initiates, reviews and recommends changes in policies and objectives, plans and programs, techniques, procedures & practices in infrastructure development & public works in general of the local government unit;
Advises the City Mayor on infrastructure, public works and other engineering matters;
Provides technical assistance to barangays of the local government unit in project planning and design and implementation of barangay projects;
Provides engineering services to the LGU including investigation and survey, engineering designs and feasibility studies as well as project management;
Exercises such other functions and performs such other duties as maybe prescribed by law or ordinances.
II. SERVICE PLEDGE
We are committed to provide courteous, prompt and excellent service to our clients. We shall see to it that, as much as possible, all requests are acted without delay and released to our clients earlier than scheduled after careful evaluation and inspection.
III. SERVICES OFFERED
Service Offered:
Required Documents/Processing Time:
Fees:
In-Charge:
|
1.Issuance of Building and Electrical Permits Requirements: *Copy of Land Title *Tax Declaration *Plans & Specs (5 sets) *Cost Estimate of Bldg. *Notarized Contract of Lease (if applicant is not the owner) Processing Time: 10 days & 43 mins. Fees will be determined by CTO based on the actual dimension/ number of streamers to be posted and the area of the street that the applicant intends to utilize, as specified in the letter-request. Mr. Darry B. Ramirez |
|
|
|
|
Service Offered:
Required Documents/Processing Time:
Fees:
In-Charge |
2.Issuance of Street and Streamer Permits Requirement: *Letter to the City Mayor requesting permission to post streamers or to utilize a portion of the city street for street dances, etc. (the letter must contain the purpose, actual dimension, duration of permit applied for, the number of streamers to be posted and Processing Time: 2 hours & 33 mins. Fees will be determined by CTO based on the actual dimension/ number of streamers to be posted and the area of the street that the applicant intends to utilize, as specified in the letter-request. Mrs. Eloisa B. Tugbo |
IV. OFFICE ADDRESS/ CONTACT NUMBERS/ OFFICE HOURS
CED Main Office: Ground Floor, City Hall Building, F.C. Ledesma Avenue San Carlos City, Negros Occidental
Contact No SACATEL (034) 3125407 Telefax (034) 3125879 Globelines (034) 7294366
Office Hours: 8:00 A.M. to 12:00 NN 1:00 P.M. to 5:00 P.M
Motorpool Bay Area: Hda. Socorro, Brgy. Punao, National Highway, San Carlos City, Negros Occidental
Tel. No. (034) 3126947
Office Hours: 7:00 A.M. to 12:00NN 1:00 P.M. to 4:00 P.M
|