2011 Completed Projects

SCHOOL BUILDINGS:

School Buildings:
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Completion of Two Classroom Building at San Juan
National High School

P460,000.00
Lump Sum Appropriation CY 2010
Mar 24, 2011
July 29, 2011

Rehabilitation of School Buildings:
Project/Location:


Appropriation:

Source of Fund:

Date Started:
Date Completed:
Restoration and Conversion of Gabaldon Building at
Cong. Vicente Gustilo Sr. Memorial School into DepEd
Library Hub
Lump Sum Appropriation Supplemental Budget # 3,
CY 2009
P2,543,370.00
Feb 16, 2010
Apr 30, 2011

Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Rehabilitation of 3 Classroom Marcos Type Building
at Katingal-an Elem. School (H)
P169,862.90
General Fund # 3311 CY 2008
Jan. 3, 2011
Mar 27, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Rehabilitation of 3 Classroom BLSB Building at
Katingal-an Elem. School (J)
P202,497.69
General Fund # 3311 CY 2008
Nov. 16, 2010
Apr 15, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Rehabilitation of 3 Classroom Marcos Type Building
at Katingal-an Elem. School (M)
P322,623.25
General Fund # 3311 CY 2008
Sept. 1, 2010
Mar 31, 2011
Project/Location:

Appropriation:
Source of Fund:


Date Started:
Date Completed:
Rehabilitation of Roofing, Roof Framing, Ceiling,
Blackboards of Two Classroom @ Bedio E/S
P616,679.00
Lump Sum Appropriation Supplemental Budget No. 1
CY 2010
Nov. 8, 2011
June 30, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Rehabilitation of 6 Classroom Bldg. @ Mag-amihan
Elementary School
P801,363.00
General Fund # 3311 CY 2010
Oct. 1, 2010
Apr 20, 2011

Project/Location:
Appropriation:
Source of Fund:


Date Started:
Date Completed:
Rehabilitation of Tal-ot Elem School
P630,307.00
Lump Sum Appropriation Supplemental Budget # 1
CY 2010
Dec. 16, 2011
July 31, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Rehabilitation of Two Classroom Building at Lagha
Elementary School
P245,345.00
Lump Sum Appropriation CY 2010
Nov. 8, 2010
Apr 20, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Rehabilitation of Five Classroom Building at San Jose
Elementary School
P564,853.00
Lump Sum Appropriation CY 2010
Apr. 7, 2011
Aug. 31, 2011
Project/Location:



Appropriation:
Source of Fund:

Date Started:
Date Completed:
Rahabilitation/Replacement of Broken Jalousies into
steel Casement Windows, Repair of Roofing, Ceiling,
Doors and Repainting of 19 Classroom at Quezon
National HS
P1,710,210.30
Lump Sum Appropriation CY 2010
Apr 20, 2011
Nov. 30, 2011

REHABILITATION AND OTHER RELATED DEP ED PROJECTS:

Rehabilitation, Demolition and Other Structures:
Project/Location:
Appropriation:
Source of Fund:

Date Started:
Date Completed:
Rehabilitation of Comfort Room at Sipaway NHS
P342,156.10
SP Allocation for Projects CY 2010
June 24, 2011
Sept. 30, 2011
Project/Location:

Appropriation:
Source of Fund:


Date Started:
Date Completed:
Construction of Rain Collector at Lamesa E/S,
Brgy. Buluangan
P136,140.00
Lump Sum Appropriation Supplemental Budget # 2
CY 2010
Dec. 14, 2010
Feb 16, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Continuation of Perimeter Fence at Don Carlos
Ledesma National High School, Brgy. Buluangan
P148,000.00
Lump Sum Appropriation CY 2010
Jan. 17, 2011
Feb 15, 2011

Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Drainage System at Doña Florentina
Elementary School
P383,960.00
Lump Sum Appropriation CY 2010
Jan. 17, 2011
May 16, 2011

Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Rehabilitation of Flooring, Roofing, Ceiling and
Windows at Division Office
P280,000.00
Lump Sum Appropriation CY 2010
Apr 28, 2011
Sept. 24, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Three Seaters Restrooms at Lagha
Extension E/S
P250,997.00
SP Allocation for Projects CY 2010
Aug. 23, 2010
Jan 31, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Three Seaters Restrooms at Bedio
Elementary School
P272,797.00
SP Allocation for Projects CY 2010
Aug. 9, 2010
Jan. 31, 2011

Project/Location:
Appropriation:
Source of Fund:

Date Started:
Date Completed:
Fencing at the Left Side of Lina dela Viña E/S
P720,272.00
Lump Sum Appropriation CY 2010
Apr. 18, 2011
Jul 31, 2011

Project/Location:
Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Three Seater Restroom at Lagha E/S
P251,175.00
Lump Sum Appropriation CY 2010
Jul 2, 2011
Oct 15, 2011

Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Three Seater Restroom at
Pinamantawan E/S
P251,175.00
Lump Sum Appropriation CY 2010
Aug. 1, 2011
Nov. 30, 2011

Project/Location:
Appropriation:
Source of Fund:

Date Started:
Date Completed:
Rehabilitation of District IV Supervisor's Office
P246,382.00
General Fund - Dep Ed; Acct. # 3311 CY 2010
Mar 10, 2011
May 25, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Track Oval at Quezon National High
School
P492,000.00
Lump Sum Appropriation CY 2011
July, 15, 2011
Oct. 31, 2011

BUILDINGS (CONSTRUCTION):

Project/Location:
Appropriation:

Source of Fund:

Date Started:
Date Completed:
New Panaad sa Negros Booth for San Carlos City
P4,171,000.00
200,000.00 (Augmentation)
Lump Sum Appropriation Supplemental Budget # 3
CY 2009
Nov. 16, 2009
Apr. 30, 2011
Project/Location:

Appropriation:
Source of Fund:


Date Started:
Date Completed:
Construction of Warehouse Building at Motorpool
Compound
P4,600,000.00
Contingency Program 20% Development Fund;
Supplemental Budget # 2 CY 2009
June 1, 2010
May 31, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
New City Health Office (Convertion of Existing Mini-
market)
P4,950,000.00
Lump Sum Appropriation CY 2010
Feb. 2, 2010
Dec. 8, 2011

Project/Location:
Appropriation:

Source of Fund:

Date Started:
Date Completed:
New City Health Office Finishing Works
P6,445,000.00
P474,000.00 (Augmentation)
Lump Sum Appropriation CY 2010
Dec. 1, 2011
Dec. 8, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Covered Basketball Court at
Barangay I
P3,000,000.00
Lump Sum Appropriation CY 2010
Mar 8, 2010
May 19, 2011

Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Barangay 5 Center, Purok Hope,
Brgy. V
P2,500,000.00
Lump Sum Appropriation CY 2010
Mar. 16, 2010
Jan 31, 2011

Project/Location:
Appropriation:
Source of Fund:

Date Started:
Date Completed:
Completion of Brgy. 5 Center
P600,000.00

Dec 1, 2011
Mar 31, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Covered Court at Barangay Center,
Brgy. Rizal
P2,900,000.00
Lump Sum Appropriation CY 2010
Feb. 1, 2011
Oct. 31, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Completion of Day Care Center at So. Amontay,
Brgy. Prosperidad
P339,306.00
Lump Sum Appropriation CY 2011
Aug. 1, 2011
Nov. 15, 2011

BUILDINGS AND OTHER STRUCTURES (REPAIR / CONSTRUCTION):

Other Structures:
Project/Location:

Appropriation:

Source of Fund:



Date Started:
Date Completed:
Conversion of the Old Public Cemetery into a Brgy
Site Phase I
P1,900,000.00
P300,000.00 (Augmentation)
20% Development Fund CY 2010;
LSA CY 2010  -  200,000.00
20% Devt. Fund CY 10 - 100,000.00
Mar 15, 2010
Jan 31, 2011
Project/Location:

Appropriation:
Source of Fund:


Date Started:
Date Completed:
Demolition & Transfer of Affected Houses Along the
30 m Wide Circumferential Road at Brgy. 6
P1,200,000.00
Lump Sum Appropriation Supplemental Budget # 1
CY 2010
Feb. 10, 2011
June 30, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Foundation & Base of the 50th Year
Landmark
P1,500,000.00
Lump Sum Appropriation CY 2010

October 2011
Project/Location:
Appropriation:
Source of Fund:

Date Started:
Date Completed:
Improvement of Ermita Wharf, Brgy Ermita, Sipaway
P1,000,000.00
Lump Sum Appropriation CY 2010
Sept. 20, 2010
May 16, 2011
Project/Location:
Appropriation:
Source of Fund:

Date Started:
Date Completed:
Fencing of Motorpool Compound (1 Side)
P300,000.00
Lump Sum Appropriation CY 2010
Feb. 9, 2011
May 31, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Conversion of the Old Public Cemetery into a Brgy
Site Phase 2
P3,306,000.00
Lump Sum Appropriation CY 2010
Dec. 16, 2010
Completed
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Water Tank Stand & Laundry Area
at City Hospital
P86,000.00
Lump Sum Appropriation CY 2010
Feb. 9, 2011
Apr 2, 2011
Project/Location:
Appropriation:
Source of Fund:

Date Started:
Date Completed:
Additional Collapsible Tents for Various City Affairs
P327,000.00

June 1, 2011
July 20, 2011
Project/Location:
Appropriation:
Source of Fund:

Date Started:
Date Completed:
Additional Office Signages for Public Building
P236,000.00
Lump Sum Appropriation CY 2010
Sept. 6, 2010
Jan. 31, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Putting up of Wooden Bodega inside the COMELEC
Office
P235,000.00
Lump Sum Appropriation CY 2011
Mar 25, 2011
Completed
Project/Location:


Appropriation:
Source of Fund:

Date Started:
Date Completed:
Fabrication of Steel Shelves and Construction of
Mezzanine Floor for Materials Warehouse Building
at Motorpool Compound
P1,080,000.00
Lump Sum Appropriation CY 2011
Apr. 16, 2011
Sept. 30, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Fabrication of additional One (1) Unit Movable Steel
Ramp for SITODMPC, City Wharf
P35,000.00
Lump Sum Appropriation CY 2011
Oct. 1, 2011
Nov. 15, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Fabrication of Two (2) Units Movable Wooden
Bulletin Board at the City Hall Lobby
P20,000.00
Lump Sum Appropriation CY 2011
Oct. 1, 2011
Nov. 9, 2011

REHABILITATION OF BUILDINGS AND OTHER STRUCTURES:

Rehabilitation/ Improvement/ Demolition:
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Extension of Office of Local Civil Registrar and
Repainting of Existing Interior
P1,385,000.00
Lump Sum Appropriation Supplemental Budget # 3
CY 2009
March 2, 2010
March 12, 2011
Project/Location:
Appropriation:
Source of Fund:



Date Started:
Date Completed:
Renovation of Public Plaza
4,790,000.00
20% Development Fund CY 2008 - P 3,000,000,
20% Development Fund CY 2009 - P1,500,000 &
Lump Sum Appropriation SB # 3 CY 2009 -
P470,000.00
Feb. 1, 2010
Sept. 2, 2011
Project/Location:
Appropriation:
Source of Fund:

Date Started:
Date Completed:
Additional Works for Public Plaza Renovation
P1,640,000.00
Lump Sum Appropriation CY 2010
Dec. 1, 2011
Sept. 2, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Imprvement of Covered Court @ Barangay Center,
Brgy. Buluangan
P615,000.00
Lump Sum Appropriation CY 2010
Nov. 16, 2010
Feb 15, 2011
Project/Location:
Appropriation:
Source of Fund:

Date Started:
Date Completed:
Fencing of Motorpool Compound (1 Side)
P300,000.00
Lump Sum Appropriation CY 2010
Feb. 9, 2011
May 31, 2011

ROADS (RURAL & URBAN):

Rural Roads:
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Concreting of Road at So. Iliranan (Phase II),
Brgy. Codcod
P5,000,000.00
Lump Sum Appropriation CY 2010
Feb. 16, 2010
Mar. 31, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Concreting Along Quezon-Codcod Road
(In front of Quezon NHS) Phase I
P4,820,000.00
Lump Sum Appropriation Supplemental Budget # 3
CY 2009
March 22, 2010
January 31, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Road Concreting at So. Maligid (Phase II),
Brgy. Nataban
P2,495,000.00
Lump Sum Appropriation CY 2010
March 16, 2010
February 1, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Concreting Along Quezon-Codcod Road (In front
of Quezon NHS to Box Culvert) Phase II
P4,930,000.00
Lump Sum Appropriation Supplemental Budget # 3
CY 2009
March 22, 2010
January 31, 2011

Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Concreting of Vasconia - Pamahawan Road,
Brgy Palampas
P1,550,000.00
Lump Sum Appropriation Supplemental Budget # 1
CY 2010
Sept. 16, 2010
Apr 30, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Portland Cement Concrete
Pavement at So. Walos, Brgy. Bagonbon Phase II
P4,000,000.00
Lump Sum Appropriation Supplemental Budget # 1
CY 2010
Sept. 13, 2010
Oct. 31, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Balisong-Pinamantawan E/S Road,
Brgy. Quezon
P655,000.00
20% Dev't Fund CY 2010 - P500,000.00;
LSA CY 2010 - P155,000.00
Sept 24, 2010
Sept 15, 2011
Project/Location:

Appropriation:
Source of Fund:
Date Started:
Date Completed:
Concreting of Purok Papaya Road to to So. Iligan
Boundary Road, Brgy. San Juan, Sipaway
P2,200,000.00
Lump Sum Appropriation CY 2010
Aug. 1, 2010
April 1, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Concreting of Road at So. Marabilla (Phase II),
Brgy. Codcod
P4,750,000.00
Lump Sum Appropriation Supplemental Budget # 1
CY 2010
Feb. 1, 2011
Oct. 31, 2011
Urban Roads:
Project/Location:



Appropriation:
Source of Fund:

Date Started:
Date Completed:
Improvement of Drainage & Concreting of Road
Shoulder (Phase I) @ Pres. Aguinaldo St.,
Pres. Magsaysay St., Pres. Romulo St. & Pres.
Quirino St, Don Juan Subd., Brgy. II
P3,700,000.00
Contingency Program 20% Development Fund
CY 2010
Jan. 17, 2011
Nov. 30, 2011
MPCP, Canals and Drainage:
Project/Location:


Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Single Barrel Box Culvert with
6 Lines RCCP Along Palampas River, So.
Pamahawan, Brgy. Palampas
P1,900,000.00
Lump Sum Appropriation CY 2010 - P1,100,000.00
Barangay Fund - 800,000.00
July 1, 2010
March 31, 2011
Project/Location:


Appropriation:
Source of Fund:
Date Started:
Date Completed:

Restoration of the Damaged Portion of the Single
Barrel Box Culvert with 6 Lines RCCP along
Palampas River, So. Pamahawan, Brgy. Palampas
P141,780.00
Lump Sum Appropriation CY 2010
July 1, 2010
March 31, 2011

Project/Location:


Appropriation:
Source of Fund:
Date Started:
Date Completed:
Restoration of the Damaged Portion of the Single
Barrel Box Culvert with 6 Lines RCCP along
Palampas River, So. Pamahawan, Brgy. Palampas
P206,000.00
Lump Sum Appropriation CY 2010
July 1, 2010
March 31, 2011

Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Installation of Additional Cross Drain at
Cabagtasan - Natuyay Road, Brgy. Codcod
P180,000.00
Lump Sum Appropriation Supplemental Budget # 1
CY 2010
Sept. 18, 2010
Feb. 29, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Multi-Purpose Concrete Pavement
at Brgy. II
P350,000.00
Barangay Fund - 100,000.00;
SP Allocation for Projects CY 2011 - 250,000.00
Sept. 1, 2011
Nov. 20, 2011
Footbridges:
Project/Location:

Appropriation:
Source of Fund:
Date Started:
Date Completed:
Construction og Footbridge at Ledesma Heights,
Brgy. Palampas
P375,000.00
SP Allocation for Projects CY 2011
July 4, 2011
Oct. 31, 2011

ELECTRICAL:

Project/Location:

Appropriation:
Source of Fund:
Date Started:
Date Completed:
Construction of Three Secondary Pole & 17 Primary
Poles at So. Tuod, Brgy. Codcod
P780,000.00
Lump Sum Appropriation CY 2010
Sept. 16, 2010
Jan. 4, 2011
Project/Location:

Appropriation:
Source of Fund:
Date Started:
Date Completed:
Electrification of Agricultural Center, So. Medina,
Brgy. Rizal
P360,640.00
Lump Sum Appropriation CY 2010
Feb 28, 2011
Aug 22, 2011

Project/Location:

Appropriation:
Source of Fund:
Date Started:
Date Completed:
Revamp of Electrical Installation @ Katingal-an E/S,
Brgy. Buluangan
P256,000.00
Lump Sum Appropriation CY 2010
Apr 16, 2011
Aug. 8, 2011
Project/Location:

Appropriation:
Source of Fund:
Date Started:
Date Completed:
Additional Installation (11 sets Ceiling Fan) at
City Auditorium
P171,000.00
Lump Sum Appropriation CY 2010
May 2, 2011
Aug. 5, 2011
Project/Location:

Appropriation:
Source of Fund:
Date Started:
Date Completed:
Installation of 3 Units (Spit Type Air Conditioning
Unit 2.0 H.P.) at Division Office
P184,000.00

Jan 17, 2911
Apr 19, 2011
Project/Location:

Appropriation:
Source of Fund:
Date Started:
Date Completed:
Installation of One (1) Air-conditioning Unit at the
Vice Mayor's Office
P33,000.00
SP Allocation for Projects CY 2011
Sept 1, 2011
Nov. 4, 2011

SPECIAL PROJECTS:

Peoples' Park Development:
Project/Location:

Appropriation:
Source of Fund:
Date Started:
Date Completed:
Installation of Lighting Fixtures (Roadway &
Rotonda) at People's Park
P415,000.00
Lump Sum Appropriation CY 2010
Dec. 6, 2010
April 8, 2011
Project/Location:
Appropriation:
Source of Fund:
Date Started:
Date Completed:
Concreting of Rotunda at People's Park
P2,300,000.00
20 % Development Fund CY 2006/2007/2008
Jan. 16, 2010
Dec. 30, 2010

Circumferential Road, Reclamation:
Project/Location:

Appropriation:
Source of Fund:
Date Started:
Date Completed:
Construction & Development of Land
Circumferential Road C1 (Boulevard)
P4,000,000.00
20 % Development Fund CY 2007
Feb. 16, 2010
Completed
Project/Location:

Appropriation:
Source of Fund:
Date Started:
Date Completed:
Construction & Development of Land
Circumferential Road C1 (Boulevard)
P210,000.00
Lump Sum Appropriation CY 2011

Completed

20% DEVELOPMENT FUND:

Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction of Warehouse Building at
Motorpool Compound
P4,600,000.00
Contingency Program 20% Development Fund
Supplemental Budget # 2 CY 2009
June 1, 2010
May 31, 2011
Project/Location:

Appropriation:

Source of Fund:


Date Started:
Date Completed:
Conversion of the Old Public Cemetery into a
Brgy Site Phase I
P1,900,000.00
P300,000.00 (Augmentation)

20% Development Fund CY 2010;
LSA CY 2010 - 200,000.00;
20% Devt. Fund CY 2010 - 100,000.00

Mar 15, 2010
Jan 31, 2011
Project/Location:

Appropriation:
Source of Fund:

Date Started:
Date Completed:
Construction  of Balisong-Pinamantawan E/S
Road, Brgy. Quezon
P655,000.00
20% Dev't Fund CY 2010 - 500,000.00
SA CY 2010 - 155,000.00
Sept 24, 2010
Sept 15, 2011
Project/Location:

Appropriation:
Source of Fund:
Date Started:
Date Completed:
Construction & Development of Land
Circumferential Road C1 (Boulevard)
P4,000,000.00
20 % Development Fund  CY 2007
Feb. 16, 2010
Completed
Project/Location:



Appropriation:
Source of Fund:

Date Started:
Date Completed:
Improvement of Drainage & Concreting of Road
Shoulder (Phase I) @ Pres. Aguinaldo St.,
Pres. Magsaysay St., Pres. Romulo St. and
Pres. Quirino St, Don Juan Subd., Brgy. II
P3,700,000.00
Contingency Program 20% Development Fund
CY 2010
Jan. 17, 2011
Nov. 30, 2011
Last Updated on Monday, 30 January 2012 17:34